ROMCIM Cement Factory

Terrestrial 3D laser scanning and detailed 2D survey drawings for the installation of two new conveyor belts at the ROMCIM cement factory in Hoghiz, providing accurate site data for equipment positioning and foundation level planning. / Project: ROMCIM Cement Factory, Hoghiz / Year of completion: 2026
Industry: Industrial
Services: 3D Scanning
Subservices: Terestrial 3D Scanning
Location: Romania

Project summary

Planning new industrial installations requires accurate knowledge of existing site conditions. At the ROMCIM cement factory in Hoghiz, Graphein supported the installation planning of two new conveyor belts by providing reliable site data for equipment positioning and foundation level planning.

Our work

Graphein carried out terrestrial 3D laser scanning across approximately 800 sqm and developed detailed 2D survey drawings, including a floor plan and three sections. Beyond data capture, we assessed the project’s actual requirements and recommended a targeted documentation solution instead of a full LOD 300 BIM model, providing the information needed for design in a more time- and cost-efficient way.

Challenges

The installation area was one of the most congested sections of the factory, with narrow spaces between silos, overlapping conveyor structures, numerous pieces of equipment and systems operating continuously. A traditional topographic survey would have required time-consuming point-by-point measurements, with the risk of additional site visits to capture any missing information.

The project also had an urgent delivery deadline. The initial approach, which involved developing a full 3D model at LOD 300, was estimated to take approximately 30 days. After assessing the design team’s actual requirements, Graphein recommended a more efficient approach: 3D scanning of the entire area, followed by a detailed floor plan and three relevant sections. This allowed the client to obtain the information needed in significantly less time, while avoiding the costs and extended timeline associated with full 3D modelling.

Results

The client received accurate, verified site information without disrupting production. The point cloud also allowed additional measurements to be extracted remotely, eliminating the need for another site visit. By tailoring the deliverables to the project’s requirements, Graphein helped reduce design uncertainties, optimise resources and provide reusable digital data for future infrastructure upgrades.

Share it on:

Facebook
LinkedIn
Email

Related Projects

Purolite Factory

Location: Romania
Industry: Industrial
Solution: BIM

Bucharest Sports Arenas

Location: Romania
Industry: Infrastructure

Alpha Wind Casimcea

Location: Romania
Industry: Renewable Energy

Solacolu Inn

Location: Romania
Industry: Heritage Conservation

Grigore Alexandrescu Hospital – Keeping the Ground Safe

Before the first concrete is poured, our people are on site, monitoring the terrain during the excavation phase.
Location: Romania
Industry: Construction

Marie Curie Children’s Hospital – Precision for the Future

Scanning, monitoring, measuring help ensure that hospitals aren’t just standing, but standing strong. That they’re ready for tomorrow’s life-saving procedures.
Location: Romania
Industry: Construction

Precision Scanning & Digital Modeling

At BMW Group’s Debrecen factory, one of Europe’s most advanced automotive plants, innovation meets sustainability in a €2 billion investment.
Location: Hungary
Industry: Industrial
Solution: BIM

Ready to future-proof your business? Let’s build a smarter, more profitable future together. Partner with Graphein today!